Flooding of Maidenbower/Furnace Green bridleway
Who is responsible?
Tabiba, yes, NR should inspect the bridge to determine whether the leaks are a serious problem, and fix if so, but ultimately it's the drainage that is the real problem that needs sorting out. Water will enter the dip along the path from both ends even if it isn't leaking through the bridge. Personally I don't think major reconstruction of the bridge is necessary or feasible. As others have said, the old part of the bridge is more elegant anyway.
Thanks for your efforts on this.
Regards,
David
Hi
Great news. Hopefully NR will continue to pump out the water as it's due to rain heavily again tonight and will be impassable again tomorrow morning. I'm not 100% clear about the suggestion you want to make, but anything that stops the flooding and keeps the tunnel safe is good.
Well done!
Preference should be put on providing an economic and effective solution to the flooding - improved drainage or raising the level of the path under the bridge to eliminate the depression there entirely.
They need a permanent solution.
I would hope that there is nothing wrong with the old bridge - if there is, and they have just stuck a new bit on it, without checking, that would be awful.
Concerned re pumping as it sounds like a temporary solution - what about a raised walkway at the sides?
I'm agree with this.
Well done on putting this together.
http://duncancrow.blogspot.co.uk/2014/02/an-end-in-sight-to-flooded-furnace.html
Duncan Crow.
West Sussex County Councillor for Tilgate and Furnace Green.
Facebook https://www.facebook.com/Tilgate.FurnaceGreen
science to think of these things. Also the tunnel has never been prone to flooding before it is only since Network Rail started their works that it has happened
Re:
You are right it is very beautiful and we should preserve our historical features, so as long as they can make it safe :)
Re:
David, I agree with you. The flood is our primary concern. My fears are that they will keep pumping to avoid a long-term solution, which is our ultimate goal. However, from inspection, many of the parents showed concern of the leakage, therefore; I think while we have the authorities attention we should air our concerns accordingly ain for long- term permanent solution x
Re:
Thank you for your comments, I am learning from all your suggestions, they are all very valuable. The flood needs to be dealt with ASAP so that the children are getting across for school on a daily basis. Meantime, NR can work out a formal permanent solution x