We love our new beach in Seaford
Contact the author of the petition
This discussion topic has been automatically created of petition We love our new beach in Seaford.
Guest |
#26 Re:2014-02-17 07:57 |
Guest |
#27 Someone posted this as an idea2014-02-17 07:59I think it has a lot of potential http://www.theguardian.com/business/2014/feb/06/swansea-bay-tidal-lagoon-power-planned |
H |
#28 Beach2014-02-17 08:03I think we need to be realistic - most of Seaford town is at or below sea level. I am lucky enough to live by the seafront but be above sea level- however vast swathes of the town are not, going back as far as Brooklyn road which is below sea level and many roads go up to the beach eg ringer road, cricket field, west view etc. the beach is not as it was pre 87- there is a lot of beach still left- held in place by granite rocks up against the sea wall- the drop from sea wall to beach was considerably more than a couple of ft as it is now. If the beach was allowed to go back to pre 87 the town would flood... Regularly pretty much every time there is a stormy high tide. Dutch engineers originally advised a groyne arm should be built at Seaford to match the Newhaven lighthouse arm creating a bay - we could've paid for that ten times over in the last thirty years rather than the cheaper option that was taken to bank the beach up with imported pebbles. If the alternative arm can be built I am in favour but if it can't the beach must be banked up again or Seaford will return to being a flood hit town - don't forget the sea has flooded all the way up to st Leonard's before! How businesses would stay in a town that floods all the time?? |
Guest |
#292014-02-17 08:45Keep the new beach as it is! Flood risk? The flood risk moaners can afford their luxury homes on the seafront, then they can fund their own flood defences. |
Guest |
#302014-02-17 08:47It would be lovely to have a sandy beach in the area, it would also bring more tourists and revenue to the area. |
Guest |
#31 Voice of Reason2014-02-17 09:51The level of ignorance in participating in this petition is astounding. It's akin to listening to a coach load of excited school children who have stepped on to a sandy beach for the first time. Thankfully the majority of locals (who have an IQ above the average sand castle) will have concerns at the damage and will lobby the council to see the beach repaired and the seafront protected against further adverse weather. Let's just wait for the first dog / child / adult to take a tumble off the promenade on to the beach and see how quick everyone is to blame the council for the beach being made unsafe. Or the homeowners opposite when their homes flood. As for the people who are insisting what's left of Seaford beach is better because it can 'be used again properly' I suggest you take a walk down the seafront on a hot summers day or better still try and get a parking space down there. I think you will be pleasantly surprised at the amount of people who manage to use it properly. |
Guest |
#332014-02-17 11:02Since when did the shingle ever stop the beach being accessible. I'm pretty sure last summer it was full. You need to stop making up silly reasons for the beach staying. The only reason you want it to stay is because it looks pretty. That's fine until seaford town floods |
Guest |
#342014-02-17 11:32As Ive lived in seaford all my life it is nice to see all the old beach back almost and it is so much easier to access now than it was with the horrible shingle which you found it hard to walk u. Instead of getting the sea denfence lorry's in to move the shingle which costs £15 million they should put the old groins back. and leave the beach alone |
Guest |
#35 Re: Someone posted this as an idea2014-02-17 11:35#27: - Someone posted this as an idea They had this idea as a plan but they didnt put it into affect it doesnt have to be one solid barrier it can be split up into sections |
Guest |
#36 Seaford beach2014-02-17 12:51The beach looks lovely, just like it used to,but we can't risk the nearby properties. With 20 yrs behind us, maybe there now is an alternative to expensive boulders and shingle.........? |
Guest |
#382014-02-17 17:12I LIVE ON THE SEAFORD SEAFRONT AND FOR YEARS, I HAVE HAD TO LISTEN TO THE NOISE OF THE DIGGERS AND LORRIES DAILY GOING UP AND DOWN THE BEACH, ITS NOISE POLLUTION !TO ALL OF US RESIDENCE WHO LIVE ON THE SEAFRONT AND HAVE TO PUT UP WITH THE NOISE! its like living next to a building site for years. THIS TOWN AND SEAFRONT IS WELL IN NEED FOR A NEW CHANGE ! |
Guest |
#392014-02-17 17:22MOVE THEN, I'M SURE THE BEACH REPLENISHMENT SYSTEM WAS THERE BEFORE YOU MOVED THERE |
The OAP |
#40 Re:2014-02-17 17:24I am sure there is a DVD at the martello tower showing the original construction of the beach in 1987. it said 9 million and 3 million tonnes of beach material was imported , Well worth the £3 they are charging for it. |
THE OAP |
#41 Re: Voice of Reason2014-02-17 17:29Well said ,
Has anyone had a look at the damage to the last piece of the promenade ,The bit past the terminal groin , It has been severly damaged and the council engineer said it will be fenced off due to public safety concerns , That is exactly what would happen to the sea wall all along the foreshore if it wasnt protected by the pebbles |
the OAP |
#42 Seaford abundance of Marine engineers2014-02-17 17:41The thing I like most about living in Seaford is the abundance of marine engineers ! who all have the solution to the issues of our promenade , Talking to each off them who all "claim to have the solution" …… but not one solution is the same! ….I guess I am lucky to be surrounded by experts because when the money is available they can all sort it out and argue who's solution is the best! |
Guest |
#43 Re:2014-02-17 18:07#38 I KNOW factually that the EA carry out the replenishment TWICE a year taking 5 weeks each time. There is a bulldozer parked at the Yacht Club for emergency repairs which includes pushing ramps for the use of the Yacht Club launching their boats and also the fisherman at the far end of the beach. |
Guest |
#45 Re: Beach2014-02-17 18:43The drop from the promenade was 6 mtrs or 20ft in old money ,The sea wall was failing and a solution was found by Southern Water at a cost off 9million pounds it was designed with a 10yr life expectancy , it has lasted 26 years so well done to the guys who decided this was the correct sea defence , Who in Seaford has flooded since it was built in 1987 , Some of the older residents will tell you of sea water in the salts and outside the post office the wellington public house, and many low lying areas, unfortunatly no one wants to hear this and think that there is a easy fix ,What we have now is the most cost effective flood protection , Well done to the EA ! |
Guest |
#462014-02-17 18:53Has anyone been down the beach in the last two days ?. OVENDEN plant are making a lovely job of repairing the damaged sea defence. A massive Thank You from Seaford |
Guest |
#472014-02-17 22:33We have a great opportunity now to do something amazing for Seaford now, a popular usable beach can only improve the local economy in so many ways! |
Sally |
#482014-02-18 00:32The breakwaters need to be rebuilt and made a lot stronger. Not only to they decrease the size of the wave they are much more attractive than a beach covered in dust and dog poo (top section). Ive lived next to Seaford beach all my life and it was truly a joy the other day to see my memories emerging from the stones. Please save the beach :) |
Guest |
#492014-02-18 01:23Please leave the beach as it is , it's like the old times like we have gone back in time everyone wants it to be that way we have waited years for this beach to go back to the way it was so please please don't change it again x |
Guest |
#50 Re:2014-02-18 06:04Hi Sally , The breakwater on the west only offers limited protection from SW winds,The terminal groin at the east end of the beach is only there to collect shingle so it can be harvested and moved to where it is required to best protect Seaford , The Terminal groin offers little or no protection from SE winds, The Beach that all our experts claim has just gone has simply been blown iinto Tidemills and is now being moved back by trucks over the next five or six weeks . I was told the Coastal Survey team will be there Tuesday to map exactly where our beach is and make sure the contactor puts the material where it will be required to be a effective Sea Defence.
|
|
Petition Against the Installation of a Biodigester at Wilson Rd, Fairfield Township, Madison County, Ohio
Stop obscene spamming of undernet network channels
Stop Industrial Development in North Manheim Township
Support Subsonic Society - Save our work places and Oslo's music history.
“We, the residents of Community Board 12, petition local authorities to take action to address the growing issues of drug sales, illegal parking, debris, illegal vendors, loitering, illegal dumping,
No Nukes for AI: Clearly a bad idea
Is there something you want to change?
Change doesn't happen by staying silent. The author of this petition stood up and took action. Will you do the same? Start a social movement by creating a petition.
Start a petition of your ownOther petitions you might be interested in
Proposed REGO price increase for motorcycles
2143 Created: 2024-10-03
Time period | Number of signatures |
---|---|
All time | 2143 |
12 months | 2143 |
"Cap Rates for South Wairarapa: Cap 2025/26 Rate Increase at 3%"
564 Created: 2024-10-16
Time period | Number of signatures |
---|---|
All time | 564 |
12 months | 563 |
Enough with the rates increase in Timaru District
437 Created: 2024-07-04
Time period | Number of signatures |
---|---|
All time | 437 |
12 months | 437 |
Support community safety. Reopen Clive Police Station.
281 Created: 2024-10-21
Time period | Number of signatures |
---|---|
All time | 281 |
12 months | 281 |
PETITION OPPOSING ' PROPERTY OVERLAYS' IN THE WAITAKI DRAFT DISTRICT PLAN 2022
212 Created: 2024-03-05
Time period | Number of signatures |
---|---|
All time | 212 |
12 months | 212 |
Oppose National Park Name Change to Waimarino
176 Created: 2024-01-17
Time period | Number of signatures |
---|---|
All time | 176 |
12 months | 176 |
People of New Zealand opposed to WHO Pandemic Treaty 28/05/22
972 Created: 2022-05-20
Time period | Number of signatures |
---|---|
All time | 972 |
12 months | 145 |
Petition to stop the erection of new 5G transmitters in Devonport
124 Created: 2024-08-12
Time period | Number of signatures |
---|---|
All time | 124 |
12 months | 123 |
Bring Seventeen to Australia
769 Created: 2024-08-06
Time period | Number of signatures |
---|---|
All time | 769 |
12 months | 769 |
Ban the Box (Planter Boxes - Mapua 'Streets for People' Project
109 Created: 2024-02-05
Time period | Number of signatures |
---|---|
All time | 109 |
12 months | 109 |
Ban Double Tap Poisoning in Mahia and Demand Safer Bait Execution
112 Created: 2024-12-26
Time period | Number of signatures |
---|---|
All time | 112 |
12 months | 111 |
Please remove concrete lane separators from Mapua
93 Created: 2024-06-24
Time period | Number of signatures |
---|---|
All time | 93 |
12 months | 93 |
Stop paid parking for Motorcycles and Scooters in Wellington
75 Created: 2024-06-13
Time period | Number of signatures |
---|---|
All time | 75 |
12 months | 75 |
Retain The Pine Trees Kaikoura South Recreation Area
66 Created: 2024-07-13
Time period | Number of signatures |
---|---|
All time | 66 |
12 months | 66 |
Oppose Palmerston North Bus Route Changes 19th February 2024
145 Created: 2023-12-14
Time period | Number of signatures |
---|---|
All time | 145 |
12 months | 66 |
Demand a satisfactory response from CertiK
7556 Created: 2024-03-27
Time period | Number of signatures |
---|---|
All time | 7556 |
12 months | 7555 |
Support for Daisy Corbet's New Zealand Residency
137 Created: 2024-08-01
Time period | Number of signatures |
---|---|
All time | 137 |
12 months | 137 |
NZTA should reduce the speed limit form 70k to 50k in the residential area of SH2 - Main North Road, Bay View
137 Created: 2022-04-07
Time period | Number of signatures |
---|---|
All time | 137 |
12 months | 60 |
Road Safety for Kaitoke Community
125 Created: 2023-12-07
Time period | Number of signatures |
---|---|
All time | 125 |
12 months | 46 |
Omokoroa Pedestrian Crossings
81 Created: 2023-12-04
Time period | Number of signatures |
---|---|
All time | 81 |
12 months | 41 |